BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 14, 2026

Site work and new construction of a municipal facility in Boulder, Colorado. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Design, fabricate, deliver, install, and maintain a rooftop utility-interactive solar photovoltaic system with a 100 kW capacity. Questions Due Date: Aug 21st 2026, 2:00 PM MDT IFC 20260309 Boulder County is soliciting proposals from a qualified contractor to design, fabricate, deliver, install, and maintain a rooftop utility-interactive solar photovoltaic system that shall produce a maximum of 100 kW. Larger capacity systems that produce more than the minimum will only be evaluated as an alternative. Work on site for this scope is anticipated to begin in the fourth quarter of 2026

GC Bidding

$350,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
110
Bidding Soon
1,694
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2026

October 15, 2026

Project location map

2525 28th St, Boulder, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.