BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated August 25, 2026

Site work and new construction of a power facility in Trumansburg, New York. Completed plans call for the construction of a power facility.

Design, procurement, installation, and commissioning of a ground-mounted solar photovoltaic (PV) system. System Specifications The proposed system should be as close as possible to the targeted 44.5 kW DC nominal capacity and 45,852 kWh generation annually at the time of installation, within the constraints of both available grant funding and compliance with the Town Standards for Minor Solar Collection Systems (212-139.1), which includes the requirement that total collector surface area of minor solar collection systems "shall not exceed 2,000 square feet," as well as with all other Town Zoning Laws. The system should be either a ground-mounted fixed-tilt or a single-axis system. Location of the solar field within the parcel, which is flat and relatively open, should not interfere with ongoing Town Highway Department material handling and operations. The location must be approved by the Highway Superintendent and Town Officials. The proposed system must be approved by the assigned NYSERDA Project Manager for the CEC grant and must meet NYSERDA's minimum performance requirements: Cost must not exceed $6.00/watt Project shall have a Total Solar Resource Fraction (TSRF) of no less than 70 as per the approved Shading Report submitted with the NY-Sun application. Project must participate in the NY-Sun Program Equipment must be in continuous use for a period of at least four (4) years. Key Components 1. Solar Panels or Modules should be Tier 1 with a minimum efficiency rating of 20%, offer a 25-year linear performance warranty and should be IEC 61215 and IEC 61730 certified 2. Inverters should be string inverters or power optimizers as appropriate, be UL 1741 SB certified for grid interconnection, and carry a minimum 10-year warranty. 3. Racking System should be engineered for local wind and snow loads per NYS Building Code, made of corrosion-resistant materials, and carry a 10-year minimum structural warranty Electrical Components comprising the balance of systems should include, as needed, DC and AC combiners , disconnect switches and surge protection along with an easy-to-use monitoring system. Question Deadline 09/04/2026 All questions must be submitted in writing to bsandler@taitem.com

GC Bidding

$3,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
117
Bidding Soon
1,709
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

November 14, 2026

Project location map

3888 Colegrove Rd, Trumansburg, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.