BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 17, 2026 at 8:00 PM

Updated August 23, 2026

Demolition, site work and new construction of a military facility in North Charleston, South Carolina. Working plans call for the construction of a military facility; for site work for a military facility; and for the demolition of a military facility.

Construction of a new Trade and Cargo Academy (TCA) and a new Cargo Security and Seized Property Training Facility (CSSPTF) at the Federal Law Enforcement Training Center (FLETC). The project includes hazardous material abatement and selective demolition of an existing vacant 30,000-square-foot, three-story building while preserving the main lobby and maintaining uninterrupted utility service to the occupied east wing. A new 28,400-square-foot, two-story flood-resilient facility will be constructed featuring a deep precast concrete pile foundation, pile-supported slabs, structural steel framing, rainscreen exterior envelope, integrated HVAC systems, LED lighting, security infrastructure, classrooms, auditorium space, production areas, and administrative offices. The project also includes construction of a new 5,985-square-foot, one-story Cargo Security and Seized Property Training Facility designed to support U.S. Customs and Border Protection training operations. The facility will provide areas for vehicle and cargo inspection, evidence processing, and simulated seized property storage. Construction features include a deep pile foundation, pile-supported stormwater systems beneath paved areas, and durable coastal materials designed for long-term service life. Both facilities are required to comply with current federal energy conservation standards, DHS security requirements, and 2021 building codes. Location: Federal Law Enforcement Training Center (FLETC), 2000 Bainbridge Avenue, North Charleston, SC 29405. The planned solicitation will result in one Firm-Fixed Price DBB construction contract. The anticipated magnitude of construction under this contract is $20,000,000 to $40,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

$40,000,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
85
Bidding Soon
1,101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2026

Project location map

To Be Determined, North Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.