Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 11, 2026 at 7:00 PM

Updated November 23, 2026

Site work for a water / sewer project in Big Bear Lake, California. Completed plans call for site work for a water / sewer project.

1. Site improvements, including grading, yard piping, and site concrete. 2. Construction of a new 21'-4" x 16'-8" CMU well building with a pump room and a chemical storage room, an asphalt shingle roof, and fiber cement gab siding. 3. Equipping of Division Well No. 9 with a 125 HP submersible vertical turbine pumping unit, including discharge piping, valves, and appurtenances. 4. All electrical, instrumentation, and control facilities required to operate the well pumping plant.

Post-Bid

$1,200,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
412
Active Projects
147
Bidding Soon
2,652
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2026

January 18, 2027

Project location map

Multiple Locations, Big Bear Lake, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed