Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 11, 2026

Site work and new construction of a pre-engineered storage facility in Marion, Texas. Completed plans call for the construction of a pre-engineered storage facility.

The Project includes the following Work The construction of a 60x100 Pre-engineered metal building ( PEMB) at the GVSUD Santa Clara Wastewater Treatment Plant. This is expected to be a multi-phase project with the initial phase consisting of the foundation, PEMB, concrete driveway, and stubups for MEP. MEP and associated office finishes will be awarded via separate project. Questions must be received by 9/3/26 at 12:00 PM so that a response maybe posted as an addendum in a timely manner prior to the bid opening. Please email all questions to: evanb@uegpros.com

Bid Results

$781,545.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
119
Bidding Soon
2,846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2026

November 9, 2026

Project location map

Multiple Locations, Marion, TX


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed