Published September 2, 2026 at 8:00 PM

Updated September 3, 2026

Demolition, site work and renovation of a municipal facility in Ottawa, Ontario. Completed plans call for the renovation of a municipal facility; and for the demolition of a municipal facility.

Mechanical cooling equipment replacement project involving chillers, condensers, cooling towers, heat exchangers, selective demolition, sheet metal flashing/trim, and firestopping. Question Deadline 08/26/2026 at 5:00 PM ET Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. The scope of the project includes the replacement of three Chiller Plants across six of the campus buildings (Building 6, 7, 8, 9 and 10E & 10W). A new centralized chiller plant will be installed in building 7 and piping connections will be made between building 6 & 7 to feed both buildings. The existing chiller plant in building 6 will be demolished. A new centralized chiller plant will also be installed in building 9 and piping connections will be made between buildings 8 & 9 to feed both buildings. Building 10 East will have its chiller plant upgraded . The building 10 W chiller plant will be used for temporary cooling while the chiller plant replacement is building 10 E is completed. Once complete, the Building 10W plant will be demolished. Buildings Cooling must remain operational during construction to maintain cooling supply for critical IT spaces and building cooling. The scope to be included in the future tender resulting from this prequalification includes: The Mechanical scope will include the isolation, demolition, removal and disposal of the existing mechanical system and the procurement, installation, startup and commissioning of the new mechanical systems as outlined in the project documentation. This will include but will not be limited to new pumps, Cooling Towers, Air Cooled Chillers, Piping, Controls, as outlined in the drawing packages. Include and coordinate all inspections with the Authority Having Jurisdiction. The Mechanical Subcontractor will be responsible for Hot Tapping and connecting into operational chiller system piping to interconnect Chilled water piping between buildings to ensure uninterrupted cooling during construction. The Mechanical Subcontractor will be required to provide project schedules for the mechanical work. EllisDon will utilize Touchplan for daily scheduling activities. All trades will be required to implement and update their project schedules in Touchplan on a weekly basis.

Post-Bid

$470,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
84
Bidding Soon
1,182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

October 12, 2026

Project location map

3500 Carling Ave, Ottawa, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.