Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 27, 2026 at 8:00 PM
Updated September 3, 2026
Site work and new construction of a mixed-use development in Morley, Alberta. Completed plans call for the construction of a 14,688-square-foot, one-story above grade fire / police facility; and for site work for a medical facility.
This report presents the results of the energy model for the Mînî Thnî Fire Hall and EMS facility located in Mînî Thnî, AB. The proposed project consists of a 1,194 m2 fire hall and EMS services building. The energy model was simulated with IESVE 2025 to demonstrate energy savings relative to the National Energy Code of Canada for Buildings 2025 (NECB) for code compliance. The climate data was based on the hourly CWEC 2016 weather file for Bow Valley, AB. This project is a Fire Hall and EMS facility comprising multiple major space functions with substantially different operational characteristics. These include fire apparatus bays (approximately 457 m²), office and associated support areas (approximately 231 m²), dormitory and associated circulation (approximately 96 m²), storage and locker rooms (approximately 151 m²), gym and dining areas (approximately 103 m²), electrical and mechanical rooms (approximately 50 m²), together with washrooms, circulation and other ancillary spaces, for a total gross interior floor area of approximately 1,194 m². While certain individual spaces may generally resemble standard archetypes such as office or multi-unit residential uses, the building as a whole cannot be reasonably represented by one or more of the building archetypes identified in Table 8.4.4.1 due to the substantial proportion of specialized emergency-response spaces and their unique operating characteristics.
Post-Bid
$4,000,000.00
Public - Federal
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2026
October 1, 2026
LOT 73 PLAN 112593 CLSR;N.E. 1/4 SEC. 24, TP. 25 R. 7 W.5 M., Morley, AB
Related To This Project
Morley, AB
Bid Date: Sep 03 2026
Morley, AB
Bid Date: May 06 2026
Morley, AB
Bid Date: Oct 01 2025
Morley, AB
Bid Date: Oct 15 2024
Morley, AB
Bid Date: Jul 30 2024
Morley, AB
Bid Date: Sep 21 2023
Morley, AB
--
Morley, AB
Bid Date: Aug 31 2022
Morley, AB
Bid Date: Dec 21 2023
Morley, AB
--
Edmonton, AB
Bid Date: Sep 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
