Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 25, 2026 at 8:00 PM

Updated October 1, 2026

Site work and new construction of a bridge / tunnel in Racine, Wisconsin. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

As of September 25, 2026 project was awarded to KR Contractors Inc, awarded amount is $404,428.66 All questions may be directed to Duane McKinney, Procurement Agent at (262) 636-3700 during regular business hours. The work under this contract shall consist of removals, excavation common, bypass channel, base aggregate, HMA pavement, storm sewer, erosion control , traffic control , restoration, pavement marking, permanent signing, curb and gutter, structures, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. REQUIREMENTS This special provision describes installing corrugated steel pipe arch provided by Racine County, as shown on the plans, in accordance with standard spec 521. Embedding and filling the bottom of the culvert with embedment material as shown on the plans and for providing and installing multi-plate anchor bolts as shown on the plan, in accordance with standard spec 506. The contractor will be required to pick up proposed culvert at 14200 Washington Avenue, Sturtevant, WI 53177 and delivery to the job site. CONTRACTOR'S RESPONSIBILITY To the fullest extent permitted by law, the Contractor shall indemnify, keep and save harmless the County of Racine, their agents, officials and employees, against all injuries, deaths, loss, damages, claims, suits, liabilities , judgments , costs and expenses , which may arise directly or indirectly from any negligence or from the reckless or willful misconduct of the Contractor or his employees, or of any Subcontractors , or any of their Material Suppliers, or employees and the Contractor shall at his own expense, appear, defend and pay all charges of attorneys and all costs any other expenses arising therefrom or incurred in connection therewith, and, if any judgment shall be rendered against the County of Racine in any such action, the Contractor shall, at his own expense, satisfy and discharge the same.

Under Construction

$404,429.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
501
Active Projects
191
Bidding Soon
3,885
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2026

September 21, 2026

Project location map

To Be Determined, Racine, WI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed