Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 4, 2026 at 8:00 PM
Updated September 11, 2026
Site work and new construction of a bridge / tunnel in Racine, Wisconsin. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.
All questions may be directed to Duane McKinney, Procurement Agent at (262) 636-3700 during regular business hours. The work under this contract shall consist of removals, excavation common, bypass channel, base aggregate, HMA pavement, storm sewer, erosion control , traffic control , restoration, pavement marking, permanent signing, curb and gutter, structures, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. REQUIREMENTS This special provision describes installing corrugated steel pipe arch provided by Racine County, as shown on the plans, in accordance with standard spec 521. Embedding and filling the bottom of the culvert with embedment material as shown on the plans and for providing and installing multi-plate anchor bolts as shown on the plan, in accordance with standard spec 506. The contractor will be required to pick up proposed culvert at 14200 Washington Avenue, Sturtevant, WI 53177 and delivery to the job site. CONTRACTOR'S RESPONSIBILITY To the fullest extent permitted by law, the Contractor shall indemnify, keep and save harmless the County of Racine, their agents, officials and employees, against all injuries, deaths, loss, damages, claims, suits, liabilities , judgments , costs and expenses , which may arise directly or indirectly from any negligence or from the reckless or willful misconduct of the Contractor or his employees, or of any Subcontractors , or any of their Material Suppliers, or employees and the Contractor shall at his own expense, appear, defend and pay all charges of attorneys and all costs any other expenses arising therefrom or incurred in connection therewith, and, if any judgment shall be rendered against the County of Racine in any such action, the Contractor shall, at his own expense, satisfy and discharge the same.
Post-Bid
$650,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2026
October 5, 2026
To Be Determined, Racine, WI
Related To This Project
Racine, WI
Bid Date: Sep 21 2026
Racine, WI
Bid Date: Oct 01 2026
Racine, WI
--
Racine, WI
Bid Date: Aug 25 2026
Racine, WI
Bid Date: Sep 08 2026
Racine, WI
Bid Date: Sep 08 2026
Racine, WI
Bid Date: Sep 08 2026
Racine, WI
Bid Date: Sep 01 2026
Racine, WI
Bid Date: Aug 20 2026
Racine, WI
Bid Date: Aug 20 2026
Racine, WI
Bid Date: Aug 18 2026
Racine, WI
Bid Date: Sep 17 2026
Racine, WI
Bid Date: Sep 02 2026
Racine, WI
--
Racine, WI
Bid Date: Aug 20 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
