Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 15, 2026 at 8:00 PM
Updated September 16, 2026
Demolition, site work and addition to an educational facility in College Station, Texas. Conceptual plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.
https://assets.system.tamus.edu/files/fpc/pdf/Subcontracting/Sept2026.pdf 02-3470 Cyclotron Institute Expansion $28,100,000 FY2026 Project Description: Capital Plan Status: Delivery Method: RFQ Posting: RFP Posting: A new addition to the existing basemen and first level of the facility is envisioned to expand on the southwest side of the Cyclotron Institute building. Space will be provided to increase beam line testing capabilities and allow for the future installation of a new spectrometer. Additional and replacement MEP equipment will be installed and a firelane route will be established to provide access from Spence St. Construction Manager at Risk Currently Posted Currently Posted FY2026. The campus has adjusted funding sources and requested Capital Plan amendment during the BOR meeting in July 2026. Capital Plan Notes: Member Contact: Programming Firm: FP&C Delivery Team: Cheryl Hanks TreanorHL Randy Wipke ------------------------------------------------------ This RFQ is the first step in selecting an A/E firm. It provides the information necessary to prepare and submit Qualifications for consideration by the Owner. The Owner may select three (3) or more of the top-qualified Respondents to present their qualifications during an interview. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."
Conceptual
$28,100,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 16, 2026
To Be Determined, College Station, TX
Related To This Project
College Station, TX
--
College Station, TX
--
College Station, TX
Bid Date: Sep 09 2026
College Station, TX
--
College Station, TX
--
College Station, TX
Bid Date: Sep 18 2026
College Station, TX
--
College Station, TX
Bid Date: Sep 14 2026
College Station, TX
Bid Date: Sep 17 2026
College Station, TX
Bid Date: Sep 24 2026
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
Bid Date: Aug 28 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
