BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 16, 2026 at 8:00 PM

Updated September 22, 2026

Demolition and site work for an educational facility in Wareham, Massachusetts. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

Scope of Work Dimensions of new retaining wall and footings are summarized below in the engineered plans. Excavate rear of failed retaining wall sections. (Will need to temporarily move deck stairs) Demolish and dispose failed retaining wall sections and existing footings. Install new footings based on engineered plans. Create forms and pour for new retaining wall sections based on engineered plans. Install chain link post sleeves based on engineered plans. Backfill wall Patch and match asphalt at completion. Reinstall any portion of wooden deck that was removed. Prevailing wage rates - See rate sheet below. Contingent on cost estimates Mandatory site visit Proposal to be submitted by two weeks after receiving this letter. 50% payment bond required

Award

$118,623.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
681
Active Projects
330
Bidding Soon
4,138
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.