BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2026 at 8:00 PM

Updated September 24, 2026

Site work, paving and new construction of a road / highway in Rancho Cordova, California. Completed plans call for the construction of a road / highway.

Improvement project including earthwork, utility coordination, roadway construction, and infrastructure modifications for the interchange area. The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and other incidental work for: the Hazel Avenue at U.S. 50 Interchange Improvements Project - Segment 1 includes widening the Hazel Avenue overcrossing of U.S. 50, modifying the westbound on-and off-ramps to incorporate a shared-use path, improving multimodal connectivity, constructing a retaining wall at the eastbound loop on-ramp to increase shoulder width and improve the clear recovery zone and widening U.S. 50 between Alder Pond and Folsom Boulevard to add an eastbound auxiliary lane. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County. Question Deadline 09/16/2026 at 4:00 PM PT Question submission online. Project No. 2022-110-GEO

GC Bidding

$28,500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
451
Active Projects
172
Bidding Soon
2,785
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

December 1, 2026

Project location map

Hazel Ave, Rancho Cordova, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.