Published October 23, 2026 at 8:00 PM

Updated October 29, 2026

Site work and new construction of a playground / park / athletic field in Plant City, Florida. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Construct and restore wetlands for stormwater treatment, excavate soils to create a 50-foot hill, install reclaimed water pipe infrastructure, and construct recreational amenities including restrooms and wetland boardwalks. Question Deadline 10/02/2026 at 2:00 PM ET All questions or requests for information regarding the solicitation must be directed to the designated Procurement Representative listed in the solicitation. The Grantee will construct an expansion of the SWWTS at the McIntosh Preserve and complete a potable reuse pilot project. Construction will include remote electrical terminals, solar remote monitoring stations for level sensors, and associated panels, apertures, and wiring and installation; excavation, grading and earth work to restore the wetlands; and reclaimed water piping, valves, and meters. The Project will also include the construction of an approximately 1 -mile boardwalk through the wetland for maintenance of weir gates and recreational use. The Grantee will lease equipment for Advanced Water Treatment (AWT) for the PPR project that will include a membrane filtration system, a reverse osmosis system, and an ultraviolet advanced oxidation process system; and complete a study for the PPR project that will include water quality sampling and analysis of wastewater effluent before and after treatment. The Grantee will also complete the preliminary design for an AWT facility that will be used as a potable reuse system and treat up to 3.5 MGD of reclaimed water at McIntosh Park. The work includes, but is not limited to, excavation of multiple wetland cells enclosed within compacted maintenance berms with associated control structures and spillways, reclaimed water line extended from the CITY's existing reclaimed water line on Alexander Street to four internal discharge points, Supervisory Control and Data Acquisition (SCADA) control of discharge valves to each of the four discharge points dependent on water elevation at percolation cells and the construction of a compacted fill mound with access ramp to the top (Bid Submission Table 1). The alternates include the unpaved parking lot, paved handicap parking lot, pre-fabricated restroom and pavilion, boardwalk, septic system and well (Bid Submission Table 1 and 2). McIntosh Park Solid Waste and Utilities Management (SWUM) Building - 902 N. Mobley St., Plant City, FL 33563 Site visit at McIntosh Park if weather permits. Commencement: 9:35 AM Ajournment: 12:30 PM Completion- 540 days The current budget is 16.6 million

Bid Results

$16,600,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
393
Active Projects
153
Bidding Soon
2,507
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2026

December 21, 2026

Project location map

775 E Knights Griffin Rd, Plant City, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed