BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 24, 2026 at 8:00 PM

Updated August 26, 2026

Site work and paving for a road / highway in Los Angeles, California. Working plans call for site work for a road / highway.

The Vermont Transit Corridor Bus Rapid Transit (BRT) project will develop a 12.4-mile express bus corridor along Vermont Avenue from Sunset Boulevard to 120th Street, including 26 enhanced stations and dedicated transit infrastructure. The project is funded through Measure M, targets completion before the 2028 Summer Olympic and Paralympic Games, and construction activities will be managed by Griffith Company

Pre-Construction/Negotiated

$425,000,000.00

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
628
Active Projects
234
Bidding Soon
4,089
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2026

Project location map

Vermont Ave, Los Angeles, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.