Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 1, 2026 at 8:00 PM

Updated November 5, 2026

Renovation of an educational facility in Stockton, California. Completed plans call for the renovation of a educational facility.

General scope of work but not limited to 1. Base Bid: All Roof Areas Per The Attached Site Map: 2. Includes removal and disposal of existing roofing system from all vertical walls, curbs, penetrations. Slice all blisters in the existing roofing to lay flat for a complete prepared roof surface to recover. 3. Install one layer of 1/2 " Dens Deck Prime insulation board, mechanically fasten with 16 screws and plates per 4'x8' sheet. 4. Install one layer of 1/4" Dens Deck Prime insulation board with screws and plates, 8 per 4'x8' sheet at all vertical walls, curbs, etc. 5. Install one layer of KEE FB 80 mil membrane adhered at all horizontal surfaces per manufactures details. 6. Install one layer of KEE NF 80 mil membrane adhered at all vertical surfaces per manufacturers details. 7. Install new KEE prefabricated boots at all pipe penetrations. 8. Install new vents at all locations and incorporate into the roof system per manufacturers details. 9. Install new equipment support blocking with a 24 gauge sheet metal pan at the fixed pipe support locations. 10. Install new C-Port or equal rubber blocks at all condensate, electrical, etc. for support blocking. Install walkway pad under each support block. 11. Install KEE walkway pad from the ladder access or roof hatch to and around all HVAC units and under all support blocking. 12. Install new 24 gauge galvanized sheet metal skirt flashing at all HVAC and roof curbs. Drawings and general provisions of the Contract, including the Conditions of the Contract and Division 01 Specification Sections apply to this Section. The work of this project consists of, but is not limited to the Scope of Work listed below. This scope is for information purposes only. It is the responsibility of the contractor to perform all work as shown, specified and required based upon the contract documents (drawings, specifications, addenda, etc.) Question Deadline 09/22/2026 at 1:00 PM PT All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to Ibrown@ Remove and dispose of existing roofing materials, repair or reinstall new roofing materials. Bonds: Bid Bond required (unspecified amount).

Bid Results

$826,152.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
574
Active Projects
248
Bidding Soon
3,672
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

November 2, 2026

Project location map

3220 Buddy Holly Dr, Stockton, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed