Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2026 at 8:00 PM

Updated October 12, 2026

Site work and paving for a road / highway in Monticello, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Trail maintenance rehabilitation to include crack filling, asphalt removal and patching or infrared patching, and road guard installation for the multi-use trail identified in the Project Specifications. The City of Monticello reserves the right to reject any or all Proposals, to waive technical specifications or deficiencies, and to accept any proposal that it may deem to be in the best interest of the City. This project consists of trail pavement rehabilitation intended to improve the serviceability and ride quality of the shared multi-use paved trail within the city. (see enclosed map of the project area). The trail segments identified for work have experienced surface deficiencies primarily in the form of surface cracking and minor to major raveling. The trail pavement will require crack filing, asphalt removal and patching or infrared patching, and Star Road-Guard installation. An alternate quote shall be provided for the crackfilling and asphalt patching work. The trail segment is a component of the City of Monticello paved trail system, a heavily-used route for trail users of all recreation types: walking/hiking/running, dog-walking, biking, rollerblading, commuting, and roller skiing. For these reasons, the Contractor must pay careful attention to the requirements for safety, maintenance of traffic, and approved work times, as referenced throughout the Contract Documents. To maintain heavy trail traffic during the summer months, the Contractor will be required to place Star Road -Guard in specific trail Segments, allowing the trail to fully dry before moving onto the next Segment. The contractor shall only close the trail segment that is actively being worked on. The contractor shall submit to the City a schedule of the intended closure dates of the trail segments one week prior to commencing work to allow the City's Communication Department to properly notify the public. The contractor shall not change the dates of closure once submitted (excluding delays due to weather related events). The contractor shall install temporary construction signage as necessary and as determined by the City. No substitutions will be allowed.

Award

$49,284.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
109
Bidding Soon
1,661
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

September 14, 2026

Project location map

Multiple Locations, Monticello, MN

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed