BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2026 at 8:00 PM

Updated September 3, 2026

Site work and new construction of a water / sewer project in Mission Viejo, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The project generally consists of constructing the Rienda Zone B Recycled Water Pump Station off Bucker Way in the City of Rancho Santa Margarita, within Rancho Mission Viejo Planning Area 3. The work includes a masonry pump station building; four vertical turbine pumps and associated motors; underground recycled-water suction and discharge piping; a flow meter vault; drainage well; valves and mechanical equipment; two surge tanks; electrical, instrumentation, control, HVAC, and cathodic protection systems; and related site improvements, including grading, paving, perimeter walls, rolling gates, drainage facilities, and erosion-control measures. The existing temporary recycled-water booster pump station must remain operational until the permanent facility is ready to be placed into service. The work also includes startup and functional testing, operator training, removal and delivery of the temporary booster pump station to the District, site restoration, and all associated work necessary to provide a complete and operational facility. Bonds: 10% Bid Bond, 100% Performance Bond, 100% Payment Bond. Question Deadline 09/28/2026 at 2:00 PM PT Online Q&A Yes

GC Bidding

$3,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
676
Active Projects
234
Bidding Soon
4,415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2026

December 4, 2026

Project location map

Bucker Wy, Mission Viejo, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.