BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 27, 2026 at 8:00 PM

Updated September 2, 2026

Demolition, site work and new construction of a power facility in Plum Grove Precinct, Nebraska. Completed plans call for the construction of a power facility; for the demolition of a power facility; and for site work for a power facility.

Installation of Owner furnished materials for a new 15kV substation, including steel, voltage regulators, circuit breakers, transformers, and switches. Scope includes site preparation, earthwork, concrete foundations, fencing, crushed rock surfacing, pre-engineered metal building installation, fuel storage systems, mechanical, electrical, and plumbing work. Includes demolition of existing substation and relocation of 1.6 MW generator and associated equipment. The work is generally described as follows: Installation of Owner furnished materials including substation steel, voltage regulator bypass switches including connectors, voltage regulators, 69 kV power fuse mountings including connectors and fuses, 69 kV station class arresters, 69 kV station post insulators, 15 kV station class arresters, 15 kV station post insulators, 15 kV vacuum circuit breakers, 15 kV station class disconnect switches, 15 kV recloser bypass disconnect switches including fuses, 15 kV group operated switch, generator step-up transformer, station power transformer, and switch plate. Furnishing and installing fence, ground grid, fine grading, crushed rock surfacing, aluminum bus, concrete foundations, pre-engineered metal building, above grade double wall fuel storage tank, 500-gallon fuel day tank with integral dual pump package, fuel piping, mechanical , electrical, plumbing, remote control panel, generator support structure, and all incidentals for a complete operational system. Relocation of 1.6 MW generator, generator control panel , remote radiator, exhaust system, battery charger, neutral grounding reactor, catalytic exhaust monitor, and 5 kV switchgear section. Field testing of one substation transformer. Demolition of the existing substation Bonds: 5% Bid Bond, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Question Deadline 09/09/2026 Question submitted to Engineer. Matt Kalin (402) 360-0217 mkalin@jeo.com

GC Bidding

$3,650,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
36
Bidding Soon
426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2026

November 16, 2026

Project location map

547th Ave & 865th Rd, Plum Grove Precinct, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.