Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2026 at 8:00 PM

Updated September 20, 2026

Site work and paving for a sidewalk / parking lot in Placentia, California. Completed plans call for site work for a sidewalk / parking lot.

ADA improvements for sidewalks and curb ramps. Online Q&A Yes Q&A Deadline 09/02/2026 2:00 PM (PDT) Any questions concerning this bid request must be submitted in writing through the City of Placentia's electronic bid management system and will be received by the Engineer up to five working days prior to the bid opening . The project includes providing all labor, materials, equipment, tools and incidentals as required to install new concrete curb ramps to meet ADA compliance and in accordance with project bid documents, plans, technical specifications, and all other references as depicted in strict adherence to the latest Greenbook, City's Standards and all other State specifications . The general items of work consist of removal of existing sidewalk, curb and gutter, and other existing improvements and construction of new concrete curb ramps, truncated domes, sidewalks, retaining curb, curb & gutter, cross gutters, full depth AC pavement, restoration of landscaping and irrigation systems, and such other items or details not mentioned above that are required to complete the project.

Bid Results

$155,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
641
Active Projects
288
Bidding Soon
4,438
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2026

October 9, 2026

Project location map

Multiple Locations, Placentia, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed