Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 20, 2026 at 8:00 PM

Updated October 22, 2026

Site work for a municipal facility in Winter Haven, Florida. Completed plans call for site work for a municipal facility.

**As of October 20, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** Beautification and landscaping work associated with the FDOT pond. Question Deadline 09/22/2026 at 2:00 PM ET Question will be received by the City of Winter Haven by electronically SCOPE OF WORK The City of Winter Haven, FL, in coordination with the Florida Department of Transportation (FDOT), seeks to enhance the appeal and functionality of the existing pond . This project aims to transform the area adjacent to the pond into an activated space that connects to adjacent retail and commercial spaces. The improvements will include landscaping, pedestrian pathways, seating, and other enhancements to create a vibrant and inviting environment within the downtown area. The work includes all labor, materials, equipment, and obtaining all applicable permits, licenses, insurance, and supervision necessary to complete the project as specified herein. All proposed improvements shall be completed in accordance with the project bid documents, design plans, details, technical specifications / scope of work and all applicable federal , state, county, and local regulatory requirements. DETAILED SPECIFICATIONS A. Landscaping Planting of native and drought-resistant plants and trees. Installation of sod and ground cover in designated areas. o Mulching around plant beds and trees. Incorporation of decorative elements such as rocks, boulders, and water features. Compliance with Florida-Friendly Landscaping(TM) principles. This will include installation of irrigation and landscaping items as the plans detail . B. Pedestrian Improvements Construction of ADA-compliant pathways and walkways. Incorporation of wayfinding signage and informational plaques. Use of permeable materials for pathways to enhance stormwater management. This will include the installation of sidewalks around the top of the pond, a boardwalk with seating, and crosswalks at several locations. C. Seating and Amenities Installation of benches and seating areas made from durable, weather-resistant materials. Placement of trash and recycling receptacles at specified locations as indicated in plans. o Incorporation of shade structures such as pergolas or gazebos. Installation of bike racks and other amenities to encourage alternative transportation. D. Environmental Considerations Use of sustainable and eco-friendly materials. Implementation of erosion control measures. o Incorporation of rain gardens and bioswales for stormwater management. o Compliance with all relevant environmental regulations and standards This project is generally located between 4th and 5th Streets SW adjacent to Avenue C SW, within the City of Winter Haven.

Post-Bid

$1,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
164
Bidding Soon
2,737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2026

December 8, 2026

Project location map

Multiple Locations, Winter Haven, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed