BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2026 at 8:00 PM

Updated September 3, 2026

Site work and new construction of a transportation facility in Sandston, Virginia. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

Construction Manager at Risk preconstruction and construction services for the Consolidated Security Screening Checkpoint Project. The Commission seeks a qualified CMAR to provide early design-phase support, constructability and phasing expertise, cost estimating , schedule development, trade-contractor procurement support, Guaranteed Maximum Price development, and complete construction management services for the Project. The CMAR will initially serve in an agency-support role during preconstruction and, upon execution of an accepted GMP amendment or other authorized construction-phase instrument, will hold and administer the construction contract. The Project will consolidate the Airport's two existing security screening checkpoints into a single centralized checkpoint and will include related administrative, support, passengerprocessing, circulation, and building-system improvements. The current planning information anticipates approximately 113,000 square feet of new construction across two levels and a new mezzanine, together with approximately 103,000 square feet of renovation on the first and second floors. The Commission has also identified enabling projects that must be completed before or coordinated with the principal checkpoint construction, including relocation of concessionaire support spaces, Airport Operations, Communications/Dispatch , and Airport conference rooms to other locations within the terminal or Airport campus. The current estimated construction cost is approximately $215,000,000. The Project is anticipated to be funded through a combination of federal grants, state grants, special appropriations, Passenger Facility Charges, and Commission funds. The selected CMAR will be required to supp Deadline for Commission Responses: Thursday, September 17, 2026 at 4:00 PM EDT Question Deadline 09/10/2026 at 4:00 PM ET -- Online portal. All Inquiries Should be Directed to: Arquesia S. Haskins, ACE, VCO, VCA Senior Procurement Specialist Email: ahaskins@flyrichmond.com Fax: (804) 652-2605 The estimated construction cost is approximately $215 million. The Commission anticipates awarding the contract by the end of November 2026, with the construction Notice to Proceed tentatively scheduled for January 2027

GC Bidding

$215,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
114
Bidding Soon
2,372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2026

January 1, 2027

Project location map

1 Richard E Byrd Terminal Dr, Sandston, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.