Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 29, 2026 at 8:00 PM

Updated November 5, 2026

Asbestos abatement for a municipal facility in Torrington, Connecticut. Completed plans call for asbestos abatement for a municipal facility.

As of October 28, 2026, this project has not yet been awarded. A timeline for award has not yet been established. Environmental abatement of the 2nd and 3rd floors of the property located at 245 E. Elm Street. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. Question Deadline 09/08/2026 at 11:00 AM ET Questions must be submitted by email to the City of Torrington Purchasing Agent Pennie Zucco (pennie_zucco@torringtonct.org). OVERVIEW Seferi Properties, LLC purchased the 245 E. Elm Street property in 2017 and began renovations to move their restaurant, Vinny's Pizza, to the second floor. A Certificate of Occupancy (CO) for the initial phase of renovations for the pizza restaurant was issued in October 2019. In 2024, the City of Torrington and Seferi Properties, LLC completed the first phase of Hazardous Building Materials Abatement for the first-floor portion of this project, enabling further environmental assessments within the first-floor interior of the building and around the exterior parking lot areas. The findings of these environmental assessments determined that the removal of the wood floors, underlying sand bedding, trench drain sediment, and sediment from one exterior catch basin was required. The first-floor demolition and remediation project was completed in October 2025. DECD awarded the City of Torrington a Municipal Brownfield Remediation Grant for the abatement work on this site in preparation for the proposed redevelopment project. This 2nd and 3rd-floor abatement project will enable the subsequent redevelopment of the property to begin. TASKS Task 1 : Develop Abatement and Renovation Work Plan and Pre-Construction Meeting 1. Task 1 objective is to attend a pre-construction meeting and develop an Abatement and Renovation Work Plan for the removal of hazardous building materials (i.e., ACM, LBP, etc.) from the site, as defined in Appendix A and the approved Alternate Work Practice (AWP). 2. Task 1 includes but is not necessarily limited to the following: a. Attend Pre-construction meeting with City of Torrington, Property Owner, and Consultant (Eagle Environmental). b. Develop an Abatement and Renovation work Plan in accordance with the approved AWP and General Conditions identified in Appendix A. i . Include a description of the methods for ACM Abatement, LBP Renovation, and removal of other Hazardous Materials as required. ii. Include limited demolition to reveal unknown or concealed conditions for examination and verification before removal or demolition. iii. Include a description of the methods for the proper management and segregation of all waste streams.Plan shall include a description for protecting Site features and structures that are designed to remain and that are not to be disturbed as part of the demolition. c. Verify proper waste characterization classifications with the Consultant and the Property Owner. d. Establish a plan for analysis and characterization of non-hazardous and hazardous waste materials for proper transportation and disposal. e. Identify the equipment to be used for the abatement and renovation activities. f. Identify all disposal facilities for pre-approval by the Consultant (Eagle Environmental). g. Identify all local, State, and federal permits and any notices required to conduct the demolition work. 3. Deliverable: A detailed Abatement and Renovation Plan for the removal, analysis, and characterization of hazardous building materials from the site that also identifies all requirements necessary to complete the work There is $346,000 in state-funding for this project. State law requires project-specific goals be set for this project based on the project's needs and available Small Business Enterprises ("SBEs") and Minority Business Enterprises ("MBEs"). The SBE goal for this project is $ 39,418. The MBE goal for this project is $37,418. The selected contractor must demonstrate good faith effort to meet the spending allocation goals.

Bid Results

$346,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,069
Active Projects
395
Bidding Soon
6,603
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2026

October 1, 2026

Project location map

245 E Elm St, Torrington, CT


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed