Published September 4, 2026 at 8:00 PM

Updated September 9, 2026

Site work and paving for a water / sewer project in Lehi, Utah. Completed plans call civil work for a water / sewer project.

Lehi City is seeking a qualified contractor for the installation of approximately 260' of 8" fused DR21 HDPE pipe within a Lehi City roadway with an additional 125' of 8" SDR35 PVC pipe within a Lehi City owned vacant building lot for the purpose of collecting ground water. Installation of 125' of 8" SDR35 PVC pipe within a vacant building lot, installation of a 5' perforated SDMH and drain curtain with fabric and drain rock meeting the gradation specified on sheet DT-1 of the EDM Partners plan set. All other work shown on the plan set and called out in the bid schedule provided with this bid advertisement. Question Deadline 09/11/2026 at 5:00 PM MT Questions regarding this RFB should be submitted through Bonfire. you may contact the individuals below. Greg AllreWater Department Manager 385-201-2425 ; gallred@lehi-ut.gov or Specific questions regarding submittal requirements and/or contract negotiations should be referred to Ben Maxfield. Ben Maxfield Management Analyst (385) 201-2526 bmaxfield@lehi-ut.gov General - Mobilization 2 Best Management Practices 3 Survey Staking and Material Testing 4 Traffic and Pedestrian Control (signing , fencing , barriers , etc.) 5 Testing, Commissioning and Cleanup 6 Permitting and Project Management Underdrain Collection - Drain Curtain and 6" Perforated Pipe, complete (including dewatering and trench stabilization) Underdrain Collection MH and Wrapped Drain Curtain, complete (including dewatering and trench stabilization) Clay Cut-Off Wall, complete Underdrain Outfall - 8" White SDR35 PVC Storm Drain, complete (including asphalt and C&G removal/replacement, and utility coordination/relocation) 4' Storm Drain Man Hole, complete 8"x4" PVC Wye and 4" Lateral, complete 12' Wide All Weather Access Road 8" DR21 HDPE Storm Drain, complete (including asphalt and C&G removal/replacement, and utility coordination/relocation) Connection to existing SD Catch Basin, complete The project is should begin no sooner than November 2nd, 2026 and must be completed by March 1st, 2027.

GC Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
50
Bidding Soon
1,141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2026

November 2, 2026

Project location map

1208 W Reggio Cir, Lehi, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.