Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2026 at 7:00 PM

Updated November 11, 2026

Site work for a playground / park / athletic field in Lehi, Utah. Completed plans call for site work for a playground / park / athletic field.

Playground replacement at Olympic Park 2700 W Parkside Dr, Lehi, UT 84043 Question Deadline 10/13/2026 at 5:00 PM MT Online Portal Respondents may contact the following individual(s) with questions regarding the project. All questions should be addressed on Bonfire and if further follow-up is needed you may contact the individuals below. Trent Dyer Parks Planning Manager (385) 201-2714 tdyer@lehi-ut.gov Specific questions regarding submittal requirements and/or contract negotiations should be referred to Mariah Hayes. Mariah Hayes Research Analyst (385) 201-2513 mhayes@lehi-ut.gov The City requires suppliers to design a play system that meets or exceeds all current playground safety standards for the age group 5-12 years . Bids shall include the costs of the play systems equipment, delivery charges, any discounts, cost of installation, and any other costs for completion of the project. Any damage caused or repairs needed for existing landscape or sprinkler system because of this project shall be the responsibility of the Supplier. The existing playground, including footings and surfacing, will be removed by Lehi City. Proposals shall include a bid price for each design presented separately. Bids shall list the cost of the equipment, surfacing, freight, and installation separately. All equipment shall meet and/or exceed all federal , CPSC, ASTM & IPEMA guidelines. Adequate safety and usage signage shall be provided at entrance of the playground. Documentation of compliance shall be provided to the City with the proposal . Equipment shall comply with the Americans with Disabilities Act (ADA), where necessary. Quality of equipment components, quality of design, play value, cost, and appropriateness to location and target demographic should be taken into consideration in the design of the play system. We expect each design to use the play area to maximize the play value. Olympic Park: Approximately 2,500 square feet (58' x 44'). Contractor to field verify. Maximum dollar amount allocated: $115,000 This project shall be completed no later than April 30, 2027.

Award

$400,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
66
Bidding Soon
1,202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2026

November 23, 2026

Project location map

2700 W Parkside Dr, Lehi, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed