BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 15, 2026 at 8:00 PM

Updated September 17, 2026

Site work for a civil project in Flagstaff, Arizona. Completed plans call for site work for a water / sewer project.

Construction Manager at Risk (CMAR) services for the U.S. 89 Flood Mitigation Project, including the Governmental Tank Storm Drain Lateral System and the Pipeline Flood Area. Question Cut Off Date 9/22/2026 02:00:00 PM (MST) Online - Q&A The general scope of work for the Project includes, but is not limited to, value engineering, cost estimating, utility coordination and relocations, berms, installation of a large storm drain system, integration with an existing very large pipe storm drain system , concrete structures (inlets at the storm drain system), roadside drainage, and may includeguardrail, handrail, other safety measures , paving, driveway matchups, fencing and hydroseeding. The project may also involve replacing a crossing at Hwy. 89 or drainage improvements at the crossing so proposals should note experience working with ADOT.

GC Bidding

$2,400,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
16
Bidding Soon
253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.