BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2026 at 8:00 PM

Updated September 13, 2026

Site work and renovation of a fitness / recreation center in Offutt AFB, Nebraska. Completed plans call for the renovation of a fitness / recreation center.

Replacement and removal of an un-level multi-surface flooring in the TACFIT area of the Offutt AFB Fieldhouse. Remove all existing equipment from space, including twelve (12) pull up racks that are bolted into the ground. Remove all existing flooring (some rubberized, some wood plank). Tack and clean the floor using concrete cleaner Install 6000 square feet of rubber flooring in original TACFIT footprint and under the rowers Removal of floor tape or excessive gum from the installation. Replace a equipment in it's original configuration: Bolt down pull up rigs and free standing pull up bars. 1.4.1 Disposal Requirements. The contractor shall be responsible for removing all recycling and waste generated material in accordance with all state, federal , local and Offutt AFB rules and regulations. 1.4.2 Contractor Qualifications. The contractor shall provide proof of insurance to the Government upon request. Question Deadline 09/16/2026 at 11:00 AM CT

Sub-Bidding

$2,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
55
Bidding Soon
695
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2026

October 1, 2026

Project location map

Offutt AFB Fieldhouse, Offutt AFB, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.