BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 14, 2026

Renovation of a municipal facility in Lincoln, Massachusetts. Completed plans call for the renovation of a municipal facility.

The Town of Lincoln Water Department is soliciting sealed bids from qualified contractors for the installation of one Hyper-Heat Pump system, with floor and wall-mounted A/C evaporators, as well as one Energy Recovery Ventilator unit sized for four people. In addition, all existing duct work will be removed and/or replaced as necessary. All accessible ducts will be cleaned or replaced as needed, all seams will be sealed and R-8 insulation applied. Questions about this bid may be submitted via email to Richard Nolli, Water Superintendent, at nollir@lincolnma.gov no later than Wednesday, September 16 at 3:00PM . The winning bidder will provide, install and electrify equipment at the address listed below as indicated: 77 Sandy Pond Rd Lincoln MA 01773 Office Area A/C Hyper Heat -installation of one (1) Mitsubishi Hyper- Heat Pump System -Installation of one (1) A/C Floor-Mounted Evaporator - Installation of two (2) A/C Wall-Mounted Evaporators - Installation of (1) 12" High Quick Sling Stand - Installation of Pipe Cover System - Supply (3) Mitsubishi Wireless Controllers NOTE: Above listed system installation to include necessary refrigeration piping, drain piping, system mounting, proper line testing and evacuation per mfg. specification, and start up. Office Ventilation System - Installation of (1) Renew Air ERV (Energy Recovery Ventilator) NOTE: Office ventilation system to provide 20 CFM per person as required for code compliance. Occupancy listed as 4 people in office space. Installation includes necessary inlet and outlet ducts, along with building fresh air and exhaust ducts to occupied space (offices) . System to be operated by occupancy timer. Duct System -All existing duct work to be removed and or replaced as necessary All accessible ducts to be cleaned or replaced as needed - All seams to be sealed -All ducts to have R-8 insulation applied. All work should include Mitsubishi Manufacturer Parts Warranty and one (1) year heating and cooling installation warranty. All work should include Renew Air ERV Manufacturer Parts Warranty and one (1) year installation warranty. All debris removal to be included in total cost.

Sub-Bidding

$60,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
911
Active Projects
404
Bidding Soon
5,176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

October 30, 2026

Project location map

77 Sandy Pond Rd, Lincoln, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.