Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 29, 2026 at 8:00 PM

Updated November 4, 2026

Site work and paving for a road / highway in Madison, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2026 LMIG/TSPLOST Patching and Repair Project (REV) - Morgan County is seeking bids for Patching and Repair. Locations- Fifth Street , West Main Street, Riden Road, Buckhead Rd, Crawford, Prospect Rd, Sandt Creek, Whitley lake Rd PATCHING PER GDOT 402 Contractor to utilize 4' milling head for patching. No payment will be made for patching widths greater than this unless marked so by the engineer. Bituminous Patching to be 220#, 330#, 440#, 550#, AS DIRECTED BY THE ENGINEER, placed material unless otherwise directed by engineer, no additional payment to be made for paving depths greater than directed. Engineer may require additional depth or reduce the depth. All patching to be paid by the unit price. Patching unit cost to include labor and material for milling, tack, and paving for this scope of work. Prior to work, existing shoulders shall be bladed no lower in elevation than the existing pavement or shoulder and made to drain. All clippings will be spread evenly or hauled away. Any areas cut lower than the existing asphalt are to be repaired immediately and shoulder recompacted. All costs associated with this work shall be included in the overall bid price. Patching over 4" will be completed in two lifts with the top lift being 9.5 mm or 12.5 mm . TACK PER GDOT 413Tack below OGI will be at the upper limit permitted by GDOT. All nozzles must spray an even distribution across the tacked area. Streaking or non- pressurized distribution will not be permitted. Emulsified or bituminous tack coat will be accepted in accordance with 413. Tack is already included with the per ton pay item for patching and widening per GDOT. STRIPING AND MARKING PER GDOT 652 AND/OR 653 All existing RPMs shall be removed prior to paving operations. All costs associated with this work shall be included in the overall bid price. Per GLM price by mile to include double yellow, solid or skip, and white edge lines. All markings will be replaced in kind Rumble strips may be replaced with either asphalt or thermoplastic. All existing pavement markings shall be replaced as 5" paint pavement markings for the full length of operations. Temporary markings may be 4". Contractor will have 150 days to complete the entire scope of work All questions or explanations requested by Bidders shall be submitted in writing to the County Engineer, . Questions shall be submitted to : aaron@tv-eng.com

Bid Results

$863,704.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
351
Active Projects
113
Bidding Soon
2,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2026

November 2, 2026

Project location map

Multiple Locations, Madison, GA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed