Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 24, 2026 at 8:00 PM

Updated September 30, 2026

Renovation of a water / sewer project in Fairfield, Connecticut. Completed plans call for the renovation of a water / sewer project.

Isolation, disconnection, removal, and replacement of an existing Make-Up Air Unit at the Return Activated Sludge building. Question Deadline 09/16/2026 at 4:30 PM ET Location : online portal The replacement unit shall be an in-kind replacement utilizing a Reznor Model RPBL500 or an approved equal. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to complete the work in a complete and operational manner. The scope of work shall include, but is not be limited to, the following: 1. Isolate, disconnect, remove, and legally dispose of the existing rooftop Make-Up Air (MUA) Unit. 2. Furnish and install one (1) new Reznor Model RPBL500 or approved equal. 3. Provide all crane services, rigging , lifting equipment, traffic control (if required), and associated labor necessary for the safe removal and installation of the rooftop unit. 4. Remove existing ductwork, gas piping, electrical conduit, wiring, controls, and associated components as necessary to facilitate removal of the existing unit. 5. Reconnect and modify existing supply and return ductwork, gas piping, and associated mechanical systems as required for the new unit, including all transitions, fittings, supports, sealing, and insulation. 6. Provide all new gas piping, piping insulation, ductwork, roof curb modifications (if required), flashing, roof patching, weatherproofing, and accessories necessary to provide a complete and watertight installation. 7. Provide all required high-voltage and low-voltage electrical wiring, conduit, fittings, disconnects, controls, and terminations necessary for a complete installation. 8. Furnish and install a new electrical disconnect switch serving the new rooftop MUA unit. 9. Remove and replace the existing circuit breaker serving the rooftop MUA unit with a properly sized breaker as required by the equipment manufacturer and applicable electrical codes. 10. Interface the new rooftop MUA unit with the existing building automation/control system and integrate all required control points to ensure proper operation with the existing facility controls. 11. Perform equipment startup, operational testing, balancing (if required), commissioning, and verification of all safety devices, controls, thermostats, and operating sequences in accordance with the manufacturer's recommendations. 12. Coordinate all work with WPCF personnel to minimize disruption to plant operations. 13. Remove all debris from the site and restore all disturbed areas, including roofing, mechanical, and electrical systems, to a clean and fully operational condition upon completion.

Bid Results

$78,092.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,090
Active Projects
451
Bidding Soon
6,672
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2026

October 23, 2026

Project location map

330 Richard White Way, Fairfield, CT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed