BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 12, 2026

Renovation of a municipal facility in Ithaca, New York. Completed plans call for the renovation of a municipal facility.

Scope of Work The contractor shall provide all labor, materials, equipment, transportation , permits, commissioning, startup services, and training necessary to complete the greenhouse modernization project. Work shall include, but not be limited to, the following activities: Task 1. Removal of Existing Equipment The contractor shall: o o o Remove existing greenhouse lighting fixtures and associated mounting hardware. Remove existing environmental control hardware identified for replacement. Remove existing controller and associated components necessary to support installation of the new control system. Place removed equipment in owner-designated storage locations or disposal containers as directed by CSHL personnel. Task 2. LED Lighting System Installation The contractor shall furnish and install: o Twenty-four (24) commercial greenhouse LED grow lights. New lighting support grid and mounting infrastructure. Electrical conduit and receptacles required to support operation of the new lighting system. Associated cabling and electrical connections. Light sensors required for integration with the environmental control system. Questions shall be submitted via email to erin.riffey@usda.gov. Please include the solicitation name and number as the subject line of the email The installed lighting system shall provide uniform supplemental lighting suitable for greenhouse research operations and shall be fully integrated into the environmental control platform. Task 3. Environmental Control System Upgrade The contractor shall furnish and install a Wadsworth Seed 24 greenhouse environmental control system or equivalent approved system capable of: o o o Environmental monitoring and control. Remote access and management. Temperature monitoring. Humidity monitoring. Light monitoring. Integration with greenhouse ventilation systems. o o Integration with supplemental lighting controls. Data collection and system management functions. The control system shall include all required controller hardware, software licenses, contactor panels, sensors, weather station components, communication hardware, and associated infrastructure necessary for a complete operational installation. Task 4. Weather Station and Sensor Upgrades The contractor shall: o Replace existing weather station components required for compatibility with the upgraded control system. Install environmental sensors necessary for operation of the Seed 24 platform. Integrate all sensors into the greenhouse control network. o Verify functionality and calibration of installed monitoring equipment.

Post-Bid

$2,500,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
130
Bidding Soon
1,804
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2026

November 9, 2026

Project location map

To Be Determined, Ithaca, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.