BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 12, 2026

Demolition, site work, paving and renovation of a water / sewer project in Lake Buena Vista, Florida. Completed plans call for the renovation of a water / sewer project; for the demolition of a water / sewer project; for site work for a water / sewer project; and for paving for a water / sewer project.

Rehabilitation of lift station including replacement of discharge piping, wet well cleaning and relining, pump replacement, installation of emergency pumping and telemetry systems, demolition of existing infrastructure, site grading, SCADA system modification, and associated concrete/paving work. Bonds: 5% Bid Bond, 100% Payment Bond, 100% Performance Bond. Q&A Deadline 09/30/2026 6:00 PM ( EDT ) Conatct - Karina Rodrigues ( 689 ) 254-3170 krodrigues@oversightdistrict.org The scope of work for the Lift Station #46 Rehabilitation includes, but is not limited to: A. Discharge piping: replace existing discharge piping and risers. B. Wet well rehabilitation: clean, repair, reline, and coat the wet well as required. C. Pumps: remove and replace the existing pumps. D. Pump discharge connections: replace pump base elbows and associated 90-degree fittings. E. Emergency pumping: install a new diesel - powered emergency pump, controls, and associated piping, including removal of the existing generator and associated controls. F. Valves and above- grade piping: replace existing check valves and plug valves, including associated piping, and relocate piping above grade. G. Fall protection: install fall protection systems and equipment in accordance with current applicable standards. H. Demolition: remove all existing piping and associated infrastructure identified for demolition on the plans, including electrical , sanitary force main, and potable water. I. Site access: construct a new access driveway, including the required concrete curb cut and associated pavement/curb repairs. J. Curb and gutter: remove and replace affected curb and gutter. K. Site grading: re- grade the site and raise the lift station and surrounding area by up to approximately 1 foot from existing grade, as required . L. SCADA: replace and/or modify the existing Supervisory Control and Data Acquisition (SCADA) system and associated equipment. M. Telemetry: install a new telemetry system in accordance with current standards to provide 24/7 monitoring and communication with the RCES Control Room. N. Instrumentation and appurtenances: replace or modify various controls and appurtenances, including floats, flow meter, wet-well level measurement equipment, air release valves, and other associated components Total Project Duration - Final Completion -- 270 Days from Notice-to-Proceed

GC Bidding

$500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
467
Active Projects
200
Bidding Soon
2,773
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2026

November 23, 2026

Project location map

1900 Hotel Plaza Blvd, Lake Buena Vista, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.