BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 24, 2026 at 8:00 PM

Updated September 27, 2026

Site work and paving for a mixed-use development in Lake Buena Vista, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Scope of Services The Central Florida Tourism Oversight District (herein after "District", "Owner" and "CFTOD") is a Special Taxing District that serves as a local government entity. The District is responsible for its public infrastructure including, but not limited to roads, bridges, and water control system. The scope of work for the 2027 Milling & Resurfacing Project includes but is not limited to: Maintenance of Traffic/Temporary Traffic Control/Lane Closures; Erosion & Sedimentation Control; Existing Paver and Concrete Header Curb Demolition; Milling & Resurfacing; Signage & Pavement Markings and Patterned Pavement Installation The Project is briefly described as follows: A. Milling & Resurfacing of the following locations: Bonnet Creek Parkway and adjoining roadways from Buena Vista Drive to Vista Blvd including Backstage Lane and Overpass Road. Hotel Plaza Blvd. from E. Buena Vista Drive to SR 535. B. Milling & Resurfacing includes milling depths ranging from 1.5" to 5" and shall utilize the following asphalt courses: SP Structural (Traffic E) (PG 82-22) depths ranging from 1.5" to 3.5" and Friction Course FC-12.5 (Traffic E) (PG 82-22) depth 1.5". C. Scope of work at Hotel Plaza Blvd. also includes the removal of existing crosswalks, including concrete header curbs and pavers, and replacement with installation of final colored asphalt patterned pavement. Coordination with resort entrances is required to maintain at least one accessible entrance/exit at each resort throughout construction, with appropriate restrictions and traffic control measures implemented as needed. License Requirements FDOT Prequalifed Contractor - Flexible Paving, Hot Plant-Mixed Bituminous Courses, and Pavement Markings Liquidated Damages $3,813/calendar day Start/Delivery Date NTP November 23, 2026 Project Duration 260 Days from NTP Question Deadline 10/13/2026 at 6:00 PM ET Online Q&A Yes

GC Bidding

$1,100,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
182
Bidding Soon
2,827
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2026

November 23, 2026

Project location map

Multiple Locations, Lake Buena Vista, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.