Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 24, 2026 at 8:00 PM
Updated September 27, 2026
Site work and paving for a mixed-use development in Lake Buena Vista, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Scope of Services The Central Florida Tourism Oversight District (herein after "District", "Owner" and "CFTOD") is a Special Taxing District that serves as a local government entity. The District is responsible for its public infrastructure including, but not limited to roads, bridges, and water control system. The scope of work for the 2027 Milling & Resurfacing Project includes but is not limited to: Maintenance of Traffic/Temporary Traffic Control/Lane Closures; Erosion & Sedimentation Control; Existing Paver and Concrete Header Curb Demolition; Milling & Resurfacing; Signage & Pavement Markings and Patterned Pavement Installation The Project is briefly described as follows: A. Milling & Resurfacing of the following locations: Bonnet Creek Parkway and adjoining roadways from Buena Vista Drive to Vista Blvd including Backstage Lane and Overpass Road. Hotel Plaza Blvd. from E. Buena Vista Drive to SR 535. B. Milling & Resurfacing includes milling depths ranging from 1.5" to 5" and shall utilize the following asphalt courses: SP Structural (Traffic E) (PG 82-22) depths ranging from 1.5" to 3.5" and Friction Course FC-12.5 (Traffic E) (PG 82-22) depth 1.5". C. Scope of work at Hotel Plaza Blvd. also includes the removal of existing crosswalks, including concrete header curbs and pavers, and replacement with installation of final colored asphalt patterned pavement. Coordination with resort entrances is required to maintain at least one accessible entrance/exit at each resort throughout construction, with appropriate restrictions and traffic control measures implemented as needed. License Requirements FDOT Prequalifed Contractor - Flexible Paving, Hot Plant-Mixed Bituminous Courses, and Pavement Markings Liquidated Damages $3,813/calendar day Start/Delivery Date NTP November 23, 2026 Project Duration 260 Days from NTP Question Deadline 10/13/2026 at 6:00 PM ET Online Q&A Yes
GC Bidding
$1,100,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2026
November 23, 2026
Multiple Locations, Lake Buena Vista, FL
Related To This Project
Lake Buena Vista, FL
Bid Date: Oct 26 2026
Lake Buena Vista, FL
Bid Date: Sep 30 2026
Lake Buena Vista, FL
Bid Date: Oct 05 2026
Lake Buena Vista, FL
Bid Date: Oct 01 2026
Lake Buena Vista, FL
--
Lake Buena Vista, FL
Bid Date: Sep 18 2026
Lake Buena Vista, FL
--
Lake Buena Vista, FL
Bid Date: Jun 30 2026
Lake Buena Vista, FL
Bid Date: Jun 25 2026
Lake Buena Vista, FL
Bid Date: Jun 11 2026
Lake Buena Vista, FL
Bid Date: Jun 17 2026
Lake Buena Vista, FL
Bid Date: Jun 18 2026
Lake Buena Vista, FL
Bid Date: Jun 11 2026
Lake Buena Vista, FL
Bid Date: Jun 18 2026
Lake Buena Vista, FL
Bid Date: Apr 30 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
