Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 10, 2026 at 8:00 PM
Updated September 13, 2026
Renovation of a military facility in Mountain Home AFB, Idaho. Completed plans call for the renovation of a military facility.
The Contractor shall provide all labor, supervision, materials, tools, equipment, and insurance necessary to apply two (2) coats of latex paint across 107 dormitory rooms to include their bathrooms and 2 stairwells located on the ends of the dormitory facility. The dormitory facility is completely unoccupied for the duration of this contract. The primary objective is to produce a uniform, defect-free institutional finish on pre-prepped wall and ceiling surfaces (approximately 81,000 square feet). Site Protection: Contractor shall furnish and place heavy-duty drop cloths and masking to protect floors, built-in cabinetry, doors, glazing, hardware, HVAC grilles, and life-safety systems (sprinklers, smoke detectors) from overspray and splatter. Paint System: Apply two (2) full, continuous, uniform coats of Sherwin-Williams 8180 Almond White Semi-Gloss latex paint to all specified interior wall and ceiling surfaces. Recoat Window: Adhere strictly to the manufacturer's specified dry/cure times between coat applications (minimum 2 to 4 hours under standard temperature and humidity). Workmanship Standards: Application via brush and roller (or airless spray with back rolling where approved by the Contracting Officer). Cut-in lines along ceilings, trim, door frames, and corners must be sharp, straight, and consistent. Finished coats must show no lap marks, holidays, runs, sags, drips, or roller texture irregularities. a. Phase 1 (Third Floor): Contractor verifies Government-prepared rooms on the 3rd floor. Prep 1 mockup room for Contracting Officer sign-off. Apply two (2) coats to all 3rd -floor dormitory rooms. Conduct 3rd-floor punch-list walk-through and achieve written sign-off. b. Phase 2 (Second Floor): C. Mobilize to the 2nd floor upon Government turnover of prepped spaces. Apply two (2) coats across all 2nd-floor dormitory rooms. Conduct 2nd-floor inspection and turnover. Phase 3 (First Floor): Mobilize to the 1st floor upon Government turnover of prepped spaces. Apply two (2) coats across all 1st-floor dormitory rooms. Final clean-up and staged material demobilization. d. Phase 4 (Final Building Turnover): Comprehensive final walk-through across all 107 rooms. Questions will be due on 10 September 2026. Answers will be posted on 11 September 2026.
Sub-Bidding
$20,000,000.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2026
November 16, 2026
366 Gunfighter Ave, Mountain Home AFB, ID
Related To This Project
Mountain Home AFB, ID
--
Mountain Home AFB, ID
Bid Date: Sep 18 2026
Mountain Home AFB, ID
Bid Date: Jun 29 2026
Mountain Home AFB, ID
Bid Date: Jun 05 2026
Mountain Home AFB, ID
Bid Date: Jun 26 2026
Mountain Home AFB, ID
Bid Date: Apr 27 2026
Mountain Home AFB, ID
Bid Date: Aug 31 2026
Mountain Home AFB, ID
Bid Date: Jun 09 2026
Mountain Home AFB, ID
Bid Date: May 08 2026
Mountain Home AFB, ID
Bid Date: Aug 11 2026
Mountain Home AFB, ID
Bid Date: Jun 05 2026
Mountain Home AFB, ID
Bid Date: May 13 2026
Mountain Home AFB, ID
Bid Date: May 13 2026
Mountain Home AFB, ID
Bid Date: May 20 2026
Mountain Home AFB, ID
Bid Date: May 15 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
