Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 12, 2026 at 8:00 PM
Updated September 14, 2026
Site work and renovation of an educational facility in Montgomery, Alabama. Completed plans call for the renovation of a educational facility.
Installation of new electrical outlets in eight locations (Rooms 125, 128, 140, Seminar rooms 1-4, and Lecture Hall RM 165) in building G832 to support instructional activities. . Project Overview Statement of Work (SOW) Ira C. Eaker Center for Leadership BLDG 832 Install Nineteen (19) Electrical Outlets at Bldg. G832 Prepared By: Eaker Center Facility Managers This project involves the installation of new electrical outlets in eight (8) locations. Rooms 125, 128, 140, Seminar rooms 1-4 and the Lecture Hall RM 165 in building G832 . The purpose of these outlets is to support instructional activities by providing reliable power sources for classroom electronics, including laptops, projectors, document cameras, and other teaching equipment. 2. Objectives Provide sufficient electrical access to support modern classroom technology. Ensure outlets are installed in locations that maximize usability for instructors and students. Meet all electrical code requirements and institutional safety standards. Minimize disruption to ongoing academic activities. 3. Scope of Work 3.1 Site Assessment Conduct a walkthrough of the eight (8) locations the outlets are required. RM 128 - install one ( 1) electrical outlet on the wall for the tv. RM 125 - install one ( 1) electrical outlet on the wall for the tv. RM 140 - install three (3) electrical outlets on the wall for tv's. Seminar room #1 - install one (1 ) floor mounted electrical outlet. Seminar room #2 - install one (1) floor mounted electrical outlet. Seminar room #3 - install one (1) floor mounted electrical outlet. Seminar room #4 - install one (1) floor mounted electrical outlet. Lecture Hall - install ten ( 10) floor mounted electrical outlets. Verify available electrical capacity and panel load. Electrical Installation o Install new 120V duplex electrical outlets at designated locations in each room. Provide necessary conduit, wiring, junction boxes, and mounting hardware. Tie new outlets into existing electrical circuits or install new circuits if required.
Sub-Bidding
$8,000,000.00
Public - Federal
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2026
October 30, 2026
50 S Turner Blvd, Montgomery, AL
Related To This Project
Montgomery, AL
Bid Date: Sep 17 2026
Montgomery, AL
Bid Date: Sep 22 2026
Montgomery, AL
Bid Date: Sep 15 2026
Montgomery, AL
Bid Date: Sep 10 2026
Montgomery, AL
Bid Date: Sep 09 2026
Montgomery, AL
Bid Date: Oct 13 2026
Montgomery, AL
Bid Date: Oct 01 2026
Montgomery, AL
Bid Date: Sep 21 2026
Montgomery, AL
--
Montgomery, AL
--
Montgomery, AL
--
Montgomery, AL
--
Montgomery, AL
--
Montgomery, AL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
