BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 26, 2026

Renovation of a detention facility in Abbotsford, British Columbia. Completed plans call for the renovation of a detention facility.

This is the first phase (Phase One) of a two-phase process: the first phase will evaluate the qualifications of all interested Respondents; the second phase (Phase Two) will invite the qualified Respondents to provide a financial bid on the project based on the specifications and drawings which will be accessible through SAP Ariba. The qualification list will expire upon award of a contract in Phase Two and the prequalification list will not be used in any other solicitation. Public Works and Government Services Canada, on behalf of Corrections Canada has a requirement for providing new 25kV power and telecom ducts in Matsqui Complex located at 33344 King Road, Abbotsford, BC. Work under this contract includes, but is not limited to: Provide new 25KV power and telecom ducts under King Road between the existing BC Hydro 25KV power pole and new 25KV site entry vault. Provide civil work including roadways, grading, curbs, security fencing and access gate for a new 25kV BC Hydro meter kiosk. Provide duct bank, pull strings, bonding to form a complete and dedicated new 25kV underground network. Provide outdoor 25KV metering kiosk, switchgear, protection, and all associated cabling and terminations. Provide outdoor transformer for TSFM building. Provide ground penetrating radar (GPR) survey scanning along new civil and duct bank routes Provide horizontal directional drilling (HDD) under existing utilities and road crossings on-site to maintain existing 24/7 services and road access. Provide separate telecom/controls cables, ducts, pull boxes, and civil infrastructure to form a complete and dedicated telecom underground network. Provide new grounding grids and bonding for pad mounted equipment and security fencing. Test and commission the new 25kV service to the outdoor switchgear. Coordinate all electrical and civil installation, testing, and commissioning for BC Hydro energization. Work to be completed within 36 weeks from contract award. Documents can be obtained from https://portal.us.bn.cloud.ariba.com/dashboard/appext/comsapsbncdiscoveryui#/RfxEvent/preview/1110023921

Post-Bid

$5,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
114
Bidding Soon
2,031
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2026

November 1, 2026

Project location map

33344 King Rd, Abbotsford, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.