BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 14, 2026

Renovation of a power facility in Chapel Hill, North Carolina. Completed plans call for the renovation of a power facility.

Installation of 2,500 linear feet of duct bank, 16,500 linear feet of primary cabling, switchgear and smart protective relays, and replacement of two 15 kV vacuum switchgears with arc flash resistant switchgears. This project serves to enhance the University's response to unplanned electrical distribution outages amongst the three substations that supply UNC's campus. The three substations serving the campus are Cameron Avenue, Manning, and South. The planned upgrades will allow the University to restore power more quickly and improve the resiliency across campus. This project will require creating approximately 2,500 linear feet of new duct bank and primary cabling arrangements totaling approximately 16,500 linear feet, along with switchgear and smart protective relays that communicate with the Electrical Distribution Systems SCADA system. A secondary goal of this project is to replace two General Electric 15 kV Powervac Vacuum Switchgears with two Arc Flash Resistant, 15 kV, 3000 Amp continuous, and 40 kA interrupting rating Switchgears located at the Cameron Substation. These replacement switchgears shall maintain hardwiring controls integration with the Cogeneration Systems Plant and communication controls interface with the Electrical Distribution Systems SCADA system.

Sub-Bidding

$14,581,920.00

Public - State/Provincial

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
116
Bidding Soon
1,729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2026

May 31, 2027

Project location map

103 Airport Dr, Chapel Hill, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.