Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2026 at 8:00 PM

Updated November 1, 2026

Site work for a road / highway in Milton, Florida. Completed plans call for site work for a road / highway.

Total Roadway Length: 0.000 Miles Total Bridge Length:0.000 Miles Total Proposal Length: 0.000 Miles The improvements under this District Contract consists of providing the labor, material, and equipment necessary to complete the landscaping project; SR 8 (I-10) Interchange at SR 281 Avalon Blvd. Landscaping in Santa Rosa County. Details of this project are shown in the Contract Plans. A total of 90 Contract days will be allowed for the installation period, and 730 Contract days will be allowed for the establishment period. This is a Lump Sum Contract with only one pay item listed in the Contract. All references to payment under individual pay item numbers, regardless of where those references are contained in the Contract Documents or when in time any such pay item reference is incorporated in the Contract Documents, are superseded by the pay item references in this Special Provision. Payment for all work in this Contract will be made under: Item No. 992-2 Lump Sum Contract - LS Pay adjustments as shown in the Contract Documents, regardless of where those pay adjustments are referenced, shall not apply, except as provided for in 9-2 Scope of Payments. Question Deadline 10/01/2026 at 5:00 PM - Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online FDOT - 001 - Landscaping - SR 8 (I-10) Interchange at SR 281 Avalon Blvd VENDOR NO. 59-3453881

Bid Results

$465,432.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
59
Bidding Soon
968
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2026

November 23, 2026

Project location map

SR-8 & SR-281, Milton, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed