Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 12, 2026 at 8:00 PM

Updated October 18, 2026

Demolition, site work and new construction of a bridge / tunnel in Saint Mary, Missouri. Completed plans call for the construction of a bridge / tunnel; and for the demolition of a bridge / tunnel.

Replacement of an existing bridge with a new 70' single span prestressed concrete box beam bridge. Scope includes clearing, grubbing, excavation, embankment, aggregate surfacing, erosion control, bridge substructure concrete, prestressed concrete box beams, bridge guardrail, and traffic control. All questions concerning the bid document preparation and project specific questions can be directed to Colter Gaebler, P.E. of S.H. Smith & Co., Inc., 901 Vine St. Poplar Bluff, MO. 63901, 1-573-785-9621.

Post-Bid

$6,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
90
Bidding Soon
1,683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed