Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 12, 2026 at 8:00 PM

Updated September 17, 2026

This is a service / maintenance or supply contract in Morristown, Vermont. Contact the soliciting agency for additional information.

Completion of final design plans for dam removal, including structural removal, stream channel restoration, sediment management, and relocation of a dry hydrant. Also includes 30% preliminary design planning for two perched culverts to improve aquatic organism passage. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."

Conceptual

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
417
Active Projects
183
Bidding Soon
2,501
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2027

Project location map

Multiple Locations, Morristown, VT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed