BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2026 at 8:00 PM

Updated September 14, 2026

Renovation of an educational facility in Brossard, Quebec. Completed plans call for the renovation of a educational facility.

Reference number: 20170024 Deadline for receipt of complaints 2026-09-24 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 6 The Marie-Victorin School Service Center, as the owner, is soliciting bids for work to replace the generator at the Lucille-Teasdale International School, located at 8350 Pelletier Blvd., Brossard, Quebec, J4X 1M8. Bids must be accompanied by a signed bid bond equal to ten percent (10%) of the bid amount, in the form of a certified check, a promissory note, an irrevocable letter of guarantee, or a surety bond. The bid bond must be issued by a financial institution that is an insurer holding a license issued in accordance with the Insurance Act (R.S.Q., c.A-32) authorizing it to conduct surety insurance business, a trust company holding a license issued under the Trust and Savings Companies Act (R.S.Q., c. S-29.01), a financial services cooperative governed by the Financial Services Cooperatives Act (R.S.Q., c. C-67.3), or a bank within the meaning of the Bank Act (S.C., 1991, c. 46). When the bid bond is in the form of a surety bond, it must be accompanied by a letter of commitment issued by the surety stating that a performance bond and a bond for obligations relating to liens, materials, and services will be provided to the successful bidder. When guarantees are in the form of a surety bond, the amount of each bond shall be fifty percent (50%) of the contract price. When the guarantee is in the form of a certified check or a promissory note, the bid bond must be made payable to the School Service Center. This bid bond may be exchanged no later than fifteen (15) days after the award letter is sent for a performance bond and a bond guaranteeing obligations for labor, materials, and services, the amount of each of which corresponds to fifty percent (50%) of the contract price. The Marie-Victorin School Service Center is under no obligation to accept any of the bids received.

Sub-Bidding

$500,000.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
560
Active Projects
304
Bidding Soon
3,222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2026

June 25, 2027

Project location map

8350 Boul Pelletier, Brossard, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.