Published September 22, 2026 at 8:00 PM

Updated September 29, 2026

Site work, new construction and renovation of a water / sewer project in Kinsey, Montana. Completed plans call for the construction of a water / sewer project; and for the renovation of a water / sewer project.

Conversion of an existing open irrigation canal to a buried irrigation pipeline including supply and installation of PIP and steel pipe, appurtenances, excavation, backfilling, and compaction. Bonds: 10% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. The work is located approximately 0.5- mile southeast of Kinsey, Montana, more specifically described as the NE/4 of Section 2 and the NW/4 of Section 1 of, Township 9 North, Range 48 East, Custer County, Montana. The Project consists of the conversion of an existing open irrigation canal to a buried irrigation pipeline as part of the Kinsey Irrigation District's (KID's ) delivery system. The project will consist of the supply and installation of approximately 5,123 lineal feet of 24 -inch diameter 80 psi Plastic Irrigation Pipe (PIP), 27 feet lineal feet of 18-inch diameter 80 psi PIP, and 57 lineal feet of 18- inch diameter 12 -gauge steel . Appurtenance for the pipe shall also be supplied and installed that include but are not limited to elbows, air vents, tracer wire, thrust blocks, tees, etc. The pipeline shall be buried to a minimum depth of 42-inch from existing ground to the top of pipe. Topsoil along the pipeline route shall be stripped to depth of 16-inches, salvaged and stockpiled , and replaced on properly compacted backfill after the pipe is installed. Revegetation of the disturbed areas will be performed by others, but the Contractor shall limit their disturbance footprint as much as possible. The headgate and concrete turnout at the beginning of the pipeline will be performed by KID. The pipeline will be terminated at STA. 51 + 23 and STA. 52 + 07 for producer interconnect. A tee at STA. 48+ 83 will be installed by the Contractor and connected to the existing pipeline. The bid form will allow the bidder to provide costs for just the materials, just the labor/equipment for installation, or both. Question Deadline 09/17/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Please submit questions to Doug Martin at kinseyirrigationco@gmail.com. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

$1,500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
6
Bidding Soon
39
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2026

November 23, 2026

Project location map

Multiple Locations, Kinsey, MT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed