Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 11, 2026

Site work and new construction of a water / sewer project in Charleston, Arkansas. Completed plans call for the construction of a water / sewer project.

Construction of a new headworks system for the wastewater treatment plant. The work specified in this Section includes furnishing all necessary labor, materials, equipment, services and incidentals required to properly clean and visually inspect, by means of color closed-circuit television (CCTV), all proposed sewer sections, including, but not limited to, all recording and playback equipment, materials and supplies. Cleaning shall include proper pressure water jetting, rodding, root cutting, bucketing, brushing and flushing of sewers and manholes prior to inspection by CCTV, pipeline rehabilitation or replacement, point repairs, manhole preparation, and testing operations. CCTV inspection shall also be performed after new installation, or after rehabilitation of, sewer mains, service lines, and manholes. The goal of cleaning is to remove debris, roots, intruding services, deposits, and other blockages to a minimum of 95 percent open. Contractor shall perform sewer cleaning work to an acceptable level as necessary to perform a thorough CCTV inspection of sewer mains and sewer services. If the pipe condition is such that cleaning may cause a potential collapse, then the pipe shall be televised without cleaning, pending approval by Owner or Engineer.

Post-Bid

$3,700,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
78
Bidding Soon
727
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2026

December 1, 2026

Project location map

Lee Western Ln, Charleston, AR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed