BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 20, 2026 at 8:00 PM

Updated September 26, 2026

Renovation of a military facility in Biloxi, Mississippi. Completed plans call for the renovation of a military facility.

1.1 GENERAL SCOPE NOTES 1.1.1 Room 115 floor tile and mastic (under carpet) contain ACM and require abatement; no other in-scope rooms contain ACM or need abatement. 1.1.2 Provide and maintain filters, temporary dust barriers, etc. to prevent construction dust and debris from spreading throughout the HVAC system, Fire System devices, and IT equipment, and other spaces. 1.1.3 Provide an additional 10% stock of new flooring material and resilient cove base for storage. 1.1.5 Provide all materials, labor, and hardware for a complete and functional installation. 1.2 DEMOLITION: 1.2.1 Furniture: See Attachment 1 for Furniture Inventory for quantities and types of furniture. 1.2.1.1 Disconnect power and data to systems furniture. 1.2.1.2 Disassemble systems furniture. 1.2.1.3 Palletize furniture (see Attachment 2). 1.2.1.4 Move furniture to climate-controlled storage unit. 1.2.1.5 Store furniture in climate-controlled storage unit for duration of construction timeline. 1.2.2 Room 113A: 1.2.2.1 Contractor shall remove all existing wood base molding, stair nosings, and transition strip (thresholds are to remain). 1.2.2.2 Contractor shall remove all existing carpet tile approximately 1,900 sf.

Post-Bid

$85,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
71
Bidding Soon
947
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2026

October 19, 2026

Project location map

To Be Determined, Biloxi, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.