BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 17, 2026 at 8:00 PM

Updated September 22, 2026

Site work and new construction of a playground / park / athletic field in Charlottetown, Prince Edward Island. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Design and build of a nine-hole disc golf course including site layout within East Royalty Park and Bonnie Blink Park. Services include site assessment, course design, visual course layout, tee sign design, course maps, tee pad locations and specifications, hazard and out-of-bounds designation, accessibility considerations, environmental protection measures, incorporation of existing baskets, and construction/installation of the course. Forest modules must be incorporated as natural obstacles and fairway-defining features Documents can be found at https://www.charlottetown.ca/business___development/developers/tendering_and_rfp Question Deadline 09/24/2026 Please direct all enquiries within 3 business days before closing via email to the contact person named above. No telephone enquiries accepted. Connie McGaugh, Purchasing Officer Email: tenders @ charlottetown.ca Proponents are asked to include the following information in their proposal: Provide an overview of the proponent's qualifications and experience. Provide an assessment / evaluation of the current park property. Provide a visual mock-up of the course layout, tee signs and course maps. Course safety needs to be taken into consideration. The course must prioritize flow and clarity. The course must respect the environment. September 2026 A mix of hole lengths and shot shapes needs to be included where possible. A level of accessibility needs to be taken into consideration. Provide tee signs that includes the hole number, par, distance, and hole map Identify out of bounds, hazard areas and other requirements. Provide marked locations for each tee pad and proposed tee pad material specifications Forest Modules Consideration The disc golf course design shall incorporate forest modules as natural obstacles and help define the structure of fairways and individual holes (Appendix H) Forest modules are contained natural areas where existing turf is removed, and the area is naturalized through the planting of a complete, self-contained ecosystem of trees, shrubs and herbaceous plants. Modules will typically have a defined edge using logs, stone or other natural materials to clearly delineate the forested area from the surrounding grass and fairway. Modules should be strategically located within the course design to provide obstacles, separation and visual interest while supporting long-term canopy and habitat development. The City's Environment and Sustainability Department will be responsible for the design, preparation and planting of the forest modules in the locations identified through the approved disc golf course design prepared by the successful vendor. Modules will be created once tees and baskets have been placed.

GC Bidding

$35,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
30
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2026

October 6, 2026

Project location map

62 Robertson Rd, Charlottetown, PE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.