Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 15, 2026

Renovation of a stadium in Manchester, New Hampshire. Completed plans call for the renovation of a stadium.

The City of Manchester DPW-Facilities requests interested firms submit qualifications for Design-Build (DB) services for replacing the ice rink refrigeration system, cooling tower and switch gear at the JFK Coliseum. The project will include design and construction services necessary for replacing the chiller, along with required pumps , cooling tower, piping, controls integration, switch gear and electrical modifications. Additional scope and services may be added as required by DPW-Facilities. The project scope will be developed as a part of this project from DPW Design Standards as provided by the Facilities Department acting as the Criteria Architect/Engineer ("Criteria A/E"). All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner's policies and procedures. B. Scope of Services The selected Design-Builder ("DB"), will provide the following categories of services: develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Schematic Design , Design Development, Construction Documents, Construction and Closeout stages. Additional Project Scope Information: Chiller Selection: Conduct a thorough analysis to select the most suitable chiller unit based on capacity, refrigerant, energy efficiency, and compatibility with existing equipment. Equipment Pre-Purchase: DB to determine if there is a need to pre-purchase the new chiller, as well as switch gear, based on an assessment of equipment availability/lead times, and schedule requirement to have the new chiller in service by August 2027. System Integration: Ensure proper integration of the new chiller with the existing chiller plant, including electrical, mechanical, and control systems. Environmental Compliance: Ensure that the project complies with all environmental regulations, including refrigerant handling and disposal. Documentation: Provide and maintain design drawings, construction drawings, bid drawings and as-builts per DPWFacilities requirements. Questions or comments regarding this proposal shall be directed in writing via email only to Josh Gagne jgagne@manchesternh.gov and received no later than 5:00 PM on Monday, October 19 2026. All questions and responses pertaining to this proposal and/or any amendments will be emailed to all the prequalified contractors by 11:00 AM on Tuesday, October 20 2026. In addition, any addendums must be acknowledged in the submitted proposal

GC Bidding

$1,300,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
693
Active Projects
358
Bidding Soon
4,839
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2026

April 15, 2027

Project location map

303 Beech St, Manchester, NH

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed