Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 17, 2026 at 8:00 PM

Updated September 27, 2026

Site work, paving and renovation of a road / highway in North Syracuse, New York. Completed plans call for the renovation of a road / highway; for site work for a road / highway; and for paving for a road / highway.

Base Scope: Exhibit A SCOPE OF WORK 2-Inch True and Level Mill and Overlay - Roadway Resurfacing - The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to perform a 2- inch True and Level (T&L) mill and overlay of the designated roadway, in accordance with applicable NYSDOT standards and local authority requirements. The limits and location of the work are identified in Exhibit A1. 1. General o Work limits, locations, and extents are shown in Exhibit A1 - Work Area. o All work shall comply with OSHA, NYSDOT specifications, MUTCD, and applicable local regulations. o Contractor shall coordinate operations to minimize impacts to traffic and adjacent properties. 2. Milling - True and Level (Including Minor Repairs) o Perform True and Level cold milling to correct pavement irregularities, rutting, and deformation, with an average milling depth of 2 inches, on Col. Eileen Collins Blvd (Inbound) and Constellation Way South, within the limits shown in Exhibit A1. Milling depth shall vary as necessary to achieve a uniform longitudinal and transverse profile and to maintain proper drainage and cross slope. . Full-width milling shall be performed unless otherwise directed. o o o . Provide smooth transitions at the limits of work, driveways, and intersections. True and Level milling shall include minor localized pavement repairs necessary to achieve a uniform andstable milled surface, including removal and replacement of unsuitable or failed pavement material encountered during milling, as directed by the Owner. Localized repairs shall be rebuilt to match the surrounding milled grade prior to placement of new asphalt. Extensive or deep structural repairs beyond the existing asphalt section are not included unless specifically authorized by the Owner. Remove and legally dispose of all milled material unless otherwise directed. 3. Surface Preparation and Tack Coat o Clean all milled surfaces of dust, debris, and loose material prior to paving. Apply asphalt emulsion tack coat uniformly to all surfaces receiving new asphalt in accordance with NYSDOT specifications.Asphalt Overlay o Place 2 inches (compacted thickness) of NYSDOT-approved 12.5mm MP401 MM516 hot mix asphalt within the work limits shown in Exhibit A1. Question Deadline 09/22/2026 Email to bids@syrairport.org

Post-Bid

$1,100,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
112
Bidding Soon
1,402
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2026

October 1, 2026

Project location map

Col Eileen Collins Blvd, North Syracuse, NY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed