Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2026 at 8:00 PM

Updated October 20, 2026

Site work for a water / sewer project in Salt Lake City, Utah. Completed plans call for site work for a water / sewer project.

Preparation of a comprehensive Wastewater Collection System Master Plan, Impact Fee Facilities Plan, Impact Fee Analysis, and Rate Study to ensure system capacity for projected growth and regulatory compliance. The purpose of this wastewater impact fee facilities plan (IFFP) is to determine the public facilities required to serve wastewater needs resulting from new development and to fulfill other requirements of the Utah Impact Fees Act {11-36a U.C.A.} . This IFFP establishes criteria, levels of service, available capacity of the existing wastewater collection and treatment systems, improvements needed to support growth, facilities estimated costs and funding options for new projects. Remove and upgrade existing 10" and 12" gravity lines to 310 ft of 12" and 1,100 ft of 15" gravity line from A15-53 to A15. Remove and upgrade existing 10" gravity line and 500 ft of 12" gravity line from A15-16 to A15-11 . Remove and upgrade existing 12" gravity line to 190 ft of 15" gravity line from A27-7 to A27. Remove and upgrade existing 8" gravity line to 2,740 ft of 10" gravity line from A42-99 to A42-25 and from A42-209 to A42-253. Remove and upgrade existing 10" gravity line to 1,050 ft of 12" gravity line from A53-5 to A53. Install 1,160 ft of parallel 18" gravity line next to existing 27" gravity line from 141 to 135. A bore crossing is required at the TRAX crossing. Install 960 ft of parallel 15" gravity line next to existing 24" gravity line from 155 to 152A. Remove and upgrade existing 12" gravity line to 820 ft of 15" gravity line from H2 to H1 . A summary of the scope of work is as follows: 1. Communication and coordination. 2. Stakeholder Engagement 3. Flow Monitoring 4. Flow Characterization 5. Inflow and Infiltration Study 6. Existing System Model Update and Identification of Deficiencies 7. Planning Future Facilities 8. Prepare Capital Facilities Plan Question Deadline 09/30/2026 at 5:00 PM MT Online Portal

GC Bidding

$400,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
74
Bidding Soon
1,224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2026

November 24, 2026

Project location map

To Be Determined, Salt Lake City, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed