Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 22, 2026 at 8:00 PM

Updated November 4, 2026

Site work and renovation of an educational facility in Belcourt, North Dakota. Completed plans call for the renovation of a educational facility.

The Project Will Include: The Supply and Installation of (2) 1,990 Gallon Propane Tanks and Vaporizer Vaporizer Shall Be Equivalent to Algas-Sdi Model Tx50 With Capacity of 2,200 Mbh Output, 5.9 Kw on 208/3/60 Electrical. Electrical Work Associated With the Tank Installation and Connection to the New Building's Electrical System. Propane Lines and Electrical Conduit From the Tank Location to the Building Already Exist. Installation of 150 of Chain Link Fencing, 6' High, With One 4 Wide Lockable Gate. Fence Posts Shall Be Installed Into Existing Asphalt Paving Multiple Prime Bids Shall Separately Represent All General. Construction Work and Must Be Accompanied by a Bond Payable to Belcourt School District #7 in the Amount Equal to Five Percent (5%) of the Bid. This Is to Serve as a Guarantee That the Bidder Will Enter Into a Contract for the Performance of Such Work If the Contract Is Awarded to Him. Only Bids, Which Are Accompanied by Such Bond With Associated Proof of Surety, Will Be Considered. All Bids Will Be Made on the Basis of Cash Payment for Such Work. After Bid Opening the Owner Will Retum the Bid Security of All Except the Lowest Responsible Bidders. When the Contract Is Awarded, the Remaining Unsuccessful Bidder's Bond Will Be Returned. The Owner Reserves the Right to Reject Any or All Bids, and Further Reserves the Right to Award the Contract in the Best Interests of the Owner he Owner Reserves the Right to Hold the Low Bids for a Period of Thirty (30) Days After the Date of the Bid Opening Each Contractor Shall Comply With the Tero Regulations of the Turtle Mountain Chippewa Reserva-Tion. Single Prime Bidding Contractors Shall Include an Identified 3% Fec Based Upon Their Contract Quote. Belcourt School District #7 Expects All Contractors to Utilize to the Greatest Extent Feasible, Cer-Tified Minority Contractors, Subcontractors, and Vendors in Good Standing With the North Dakota Mi-Nority Contractors Association. Contractors Will Be Responsible for an EPA Fee in the Amount of 1% The Owner May Waive Any Formalities, and Retains the Rights to Reject Any or All Bids.

Bid Results

$182,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2026

November 19, 2026

Project location map

1207 William Hardesty St, Belcourt, ND

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed