Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 8, 2026 at 8:00 PM

Updated October 14, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in New Tripoli, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

The work includes but is not limited to all labor, materials, tools, oversight and permits required to Demolition and removal of existing dual 42 inch pipes, concrete culvert, and walls, installation of a precast culvert, associated site work, erosion and sediment controls, bypass pumping, site preparation and restoration, temporary and permanent traffic control, paving, guiderail installation, and stream reconstruction including pools and riffles. Bonds: 10% Bid Bond, 100% Performance Bond, 100% Payment Bond. Question Deadline 10/01/2026 at 3:00 PM ET Questions must be submitted through online. The work includes but is not limited to all labor, materials, tools, oversight and permits required to demolish and remove the existing dual 42" pipes, concrete culvert, and walls on Blacksmith Road in Weisenberg Township and install a precast culvert included but not limited to all associated site work, erosion and sediment controls, bypass pumping, site preparation and restoration, temporary and permanent traffic control, paving, and guiderail installation. Manufacture, delivery of the new culvert and footers will be completed by the manufacturer which has been bid and awarded by the Township. Sitework contractor will be required to coordinate delivery and placement of the new culvert and footers with the manufacturer The stream reconstruction involves a series of pools and riffles that extend 150 feet through the streambed beginning approximately 50 feet upstream of the culvert and ending approximately 75 feet downstream of the culvert. These pools and riffles are detailed on the plans including stone size, location, number, width, and elevation. The modifications to the streambed are critical in nature and care should be taken to meet the specifications indicated in the plans and details. Project completion must be certified by our office and will not be granted unless these features are completed to satisfaction of the Design Engineer.

Bid Results

$180,542.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
707
Active Projects
287
Bidding Soon
3,845
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2026

November 17, 2026

Project location map

3562 Blacksmith Rd, New Tripoli, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed