Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2026 at 8:00 PM

Updated October 8, 2026

Demolition, site work and new construction of a mixed-use development in Melrose, New York. Completed plans call for the construction of a 10,664-square-foot, one-story above grade fire / police facility; and for the demolition of a fire / police facility.

Demolition of the existing station and construction of a new 10,664 square foot, one-story, five bay fire station with associated spaces and community room. Bonds: 5% Bid Bond, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Question submitted to Architect. Balzer + Tuck Architecture 468 Broadway Saratoga Springs, NY 12866 (518) 580-8818

Sub-Bidding

$6,900,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
137
Bidding Soon
2,250
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2026

March 1, 2027

Project location map

784 NY-40, Melrose, NY


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed